Winslow Wharf Marina

Bainbridge Island, WA  Winslow 1

October 2014 – Present

Renovation

Falkin Lead: JB Hall

 

This project is to update and/or replace all of the floating structures of an existing marina with new floats; modify the existing fixed pier; and install a new ADA-compliant ramp connecting the fixed pier to the new floats. This project has been done in two phases in order to keep the boats docked. Phase 1 replaces the west half of the marina, and modifies the existing fixed pier and installs the new ramp. Phase 2 will replace the east half of the marina.